Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answers were Sorted based on User's Feedback



Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / v.parthiban

a1+b1+root of a1*b1*h/3 footing size 7*7m 30cm*30cm
a1=49 b1=0.12m h=.3m
49+.12+root of 49*.012 *.3/3
49.12 + 2.425*.10
51.545*.10= 5.155cum

Is This Answer Correct ?    14 Yes 15 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / mohammed sadiq

Answer is 1.1053 m3

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / umesh gumme

avg of D & d=0.5+0.15/2=0.325
size of footing 1.7*2 no of footing assume 5
no*(avg+D)*(avg+D)*(D-d)
5*(0.325+0.5)*(0.325+0.5)*(0.5-0.15)
5*0.825*0.825*0.485=1.65 m cube

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / habesingh barde

V=h/3(A1+A2+(under rootA1*A2)
where, h=hieght of trepezoidel
A1=area of lower shap
A2=area of upper shap

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / abdul kohinoor

 a+b 
where a= l*b*h

b= h/3[(A1*A2)+underrood A1+A2

Is This Answer Correct ?    4 Yes 6 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / ananth

h/3(a1*a2)+root of a1^2*a2^2
a1-area of bottom
a2-area of top
h-over all height

Is This Answer Correct ?    6 Yes 12 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / bibekananda mishra

Volume of Trapezoidal footing = [(B+D)/2*d]*l
= [(1.7+0.5)/2*0.15]*2= 1.1*0.15*2= 0.33Cum

Is This Answer Correct ?    8 Yes 18 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / deepak

isolated and combined footing formula

Is This Answer Correct ?    3 Yes 13 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / mohan kasabe

formula:

sum of two parallel side
------------------------X perpendicular distance
2

suppose side A-2m & B-1.7
sum of D & d (.5+.15 )=0.325

(2+1.7)/2*0.325=0.601 cum.

Is This Answer Correct ?    20 Yes 44 No

Post New Answer

More Civil Engineering Interview Questions

What is mean by ITP in a construction project

6 Answers  


WHY THE WIDITH OF COLUMN IS TAKEN FOR DESIGN OF ISOLATED FOOTING??

9 Answers   L&T,


extra how much quantity need to fill the actual excavated quantity.

4 Answers   L&T, Mechanical,


How to Calculate no.of bricks in 1sq.mtr

3 Answers   SADC,


What out turn civil works

0 Answers  






what should be the deduction for bend in stirrups while calculating cutting length? Is it 1 dia at each bend?

6 Answers  


how many lab test on bricks and aggregate write briefly please

2 Answers   NPC, Omaxe,


What do you meant by gui?

0 Answers  


Providing and fixing in position Tor steel to footings, foundation, slabs, beams, columns, canopies, stair case, newels, chajjas, lintels, etc. including cutting, bending, hooking the bars, binding with wires. give me the rate M.ton.

1 Answers  


50m3 concrete volume how much cement sand aggregate details radio m20grade

5 Answers   L&T, Mars Planning Engineering Services, Relcon Infraprojects,


Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions

0 Answers   State Bank Of India SBI,


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

0 Answers   TVO,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)