what is pouring and explain
No Answer is Posted For this Question
Be the First to Post Answer
what is the curing time for plastring (all)?
purpose of binding wire in RCC. Structually is there any requirements that how to tie the binding wire like cross or single or how many pices combine together to bind the steel. i need structually importance of binding wire.
what are the tests conducted on cement,aggregate and concrete?briefly explain that tests procedure and limits adopted for safety side.
How much material will consume for following specification water tank (9*7.5*6 feet)?
How many No of 4" Bricks Get consumed in 9" thick BB Masonary Wall of 1 cu.m.?
levelling least count
-what is the meaning of M.S.L for civil field? -what is the grade slab and suspension slab?
How much do you want salary?
what"s the formula to find the cement,sand,aggreegate(45mm) requirement for PCC?
What is limit state method and working stress method and ultimate method
For M25 concrete ,what is the maximum compressive strength at 28 days ?
6 Answers L&T, Techno Builders,
How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)