which grade of steel is better for construction of building under earthquake zones ? why?
Answers were Sorted based on User's Feedback
Answer / ashok sakhare
Mix ratio 1:1.5:3 concrete
cement required for 1Cum 7.9 bags
1/7.9 = 0.126 Cum for 1Bag
Mix ratio 1:2:4 concrete.
cement required for 1Cum 6.27 bags
1/6.27 = 0.159 Cum for 1Bag
Is This Answer Correct ? | 0 Yes | 2 No |
which method is used in semi-rigid connection design??
In jack arch floor, the rise is kept?
how many cement bags required for one cum of brick work the brick size is 20x10x10.
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
Why the name is "partial safety factor" why not "safety factor"?
0 Answers Engineers India Limited,
What is cement-concrete ratio ?
How to find arc area with using angle?with out using angle?
WHAT IS TEAM SIZE IN CONSTRUCTION WORK
what is the life span of water proffing plywood for concreteshuttering work
what is the allowable limit of wastage of cement for RMC at plant operated manualy
How to calculate no of 12 mm dia bars in a ton