Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / mohammed sadiq
Answer is 1.1053 m3
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
Which is stronger solid steel rod or hollow steel pipe?
what is the maximum number of course that can be laid according to IS code and the max height.
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
Describe Briefly The Various Methods Of Concrete Curing?
In jack arch floor, the rise is kept?
Which purpose we use deck anchor in bridges?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
How to calculate construction cost of residential building in mumbai
60-70 grade of Bitumen is VG-30 ?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
Time required for curing of wall tiles before fixing
yasser arfatcompleted his degree in civil from which university