how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answers were Sorted based on User's Feedback
Answer / sateesh patil
If you Consider M25 Grade Concrete Nominal mix Design is
1:1:2(1 Cement:1 Sand:2 Aggregates)
1+1+2=5
Volume of Dry Mix=1.5% X Volume of wet mix
If you Consider 1 Cum Concrete
Cement=1/5X1.5(1)=0.3 Cum(1 Bag of Cement=50 Kgs=1.235
Cft=0.035 Cum)
Then 0.3 /0.035=8.57 bags=428 kgs
Sand=1/5X1.5(1)=0.3 Cum=10.584 Cft
Aggregates=2/5X1.5(1)=06 Cum=21.168 Cft
| Is This Answer Correct ? | 53 Yes | 172 No |
strenth of brick
if 6.0M x3.0M Boat floating on water One person Sit on Boat Then the boat Sink about 15cm .Then what is the wt of person.
how many cement in cubic feet of 40 kg bag white cement.
For what purpose bedding is used under storm water drains, explain?
what is the formula for calculating volume of isolated footing? i am not asking for the sloped footing, i am asking for normal rectangle isolated footing, pls add diagram or linkof diagram with answere
as per is code, what is the minimum content of opc and ppc cement for rcc structure
what is mean by Face bar using in coloums?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
What is the standard volume of pharma in cub ft
0 Answers Deepa Constructions,
What is Lap Length??????
slump test report
what is difference between open and well foundation ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)