how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?
Answers were Sorted based on User's Feedback
Answer / sateesh patil
If you Consider M25 Grade Concrete Nominal mix Design is
1:1:2(1 Cement:1 Sand:2 Aggregates)
1+1+2=5
Volume of Dry Mix=1.5% X Volume of wet mix
If you Consider 1 Cum Concrete
Cement=1/5X1.5(1)=0.3 Cum(1 Bag of Cement=50 Kgs=1.235
Cft=0.035 Cum)
Then 0.3 /0.035=8.57 bags=428 kgs
Sand=1/5X1.5(1)=0.3 Cum=10.584 Cft
Aggregates=2/5X1.5(1)=06 Cum=21.168 Cft
Is This Answer Correct ? | 53 Yes | 172 No |
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
How much time Required for PPR pipe network testing
for mortar 1:18 how much cement and sand required for 1 CM
how many litr. of paint will required for 1 sqm area of wall(internal wall and external wall) ??
how many bricks in 1 one cubic meter?
how to doing or how to prepare the or which things can be done on the site when construct the building?
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
Explain major differences between routing maintenance and major maintenance.
define silt?
What is "L" provided at the base of column??
How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?
colum 500*500 8mm cutting lenght