Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


explain the difference between short column and long column



explain the difference between short column and long column..

Answer / mohammed abdul raheem

short column is when the slenderness ratio less than 12
long column is when the slenderness ratio greater than 12.
short column failure crushing and long column failure buckling.

Is This Answer Correct ?    6 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.

0 Answers  


how we can calaculate cutting lengh for stiruups 6mm dia . column size 20 cm x 30 cm, cover 20mm

8 Answers  


How foundation is designed, Column design and beam design

0 Answers   College School Exams Tests, L&T,


What do you understand by “preset” during the installation process of bridge bearings?

0 Answers  


What is the unit weight of steel?

1 Answers  


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

0 Answers  


Scaffolding IS code NO.

0 Answers  


is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

0 Answers  


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

0 Answers   KD infra,


An invisible line should intersect a visible line with

1 Answers   PSC, PSCI, SPC Systems,


While calculating quantity of cement required for 1 qubic meter If mix is m25 1:1:2 =4 1.52/4=0.38, 0.38x1440=547.20 kgs I know 1440 is unit weight of cement And what is 1.52 ? And some one using 1.54 and 1.53 etc... Why they are using can u explain me what is 1.52, 1.53, 1.54?

4 Answers  


How to calculate concrete,s cement, sand, metal on the bases of its ratio. For any volume of work please give me brief calculation

5 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)