How to calculate carrying capacity of the existing water
supply trunkmain
No Answer is Posted For this Question
Be the First to Post Answer
How to check slab shuttering level.? Or check list for slab ?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
Please let me know the name of university which is offered distance education in BE or Btech in direct 3rd samester????
i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula
what is the calculation of raw material for 0.35cum of m-15
Write down a formula to calculate the number of 50Kg bags of cement for moulding of cement blocks of tcm thick by 20cm high by 40cm long on site with a mix ratio of 1 bag of cement to 3 wheelbarrows of sand . the sand is measured at a STRUCK( WATER LEVEL) 65 litres capacity wheelbarrow. TEL: +237 674630019
What should be percentage of silt content in sand?
how much cement consumption in box type waterproofing
why do you desire to change from your current position?
Characteristics of a model project are ––
what is PEB structure
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)