While casting slab at what length slab casting should be stop
Answers were Sorted based on User's Feedback
Answer / manoj kumar bhola
AT L/3 OF THE SPAN THE SLAB CASTING SHOULD BE STOP.WHERE L IS THE LENGTH OF SPAN.
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / vikas sampat mahadik
As per my view casting can be done to any extend,only care to be taken for joints,because setting time will be different at certain distance after casting.Every casting end should left angular,later jointing compound should be applied,at beams half beams should be filled in slant,cement slurry has to be applied ,Newer end casting of slab in center, it may end distance 1/3rd from beam.
| Is This Answer Correct ? | 2 Yes | 3 No |
Why you are leaving present job?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What is the density of steel?
Define absolute co-ordinates?
what is the difference between composition of ceramic & glazed tiles?
How we paste the Granite Slabs at External Wall?Is there any chemical compound material was using?
we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it any thumb rule for calculating the head please reply urgently
which is code used for ppc cement
Explain what is zoning permit?
What is the use of extruded feature in solidsworks?
What is meaning of M25 grade
Did any of the egyptian pyramids ever fall down?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)