Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answer Posted / sateesh patil

If you Consider M25 Grade Concrete Nominal mix Design is
1:1:2(1 Cement:1 Sand:2 Aggregates)

1+1+2=5

Volume of Dry Mix=1.5% X Volume of wet mix
If you Consider 1 Cum Concrete
Cement=1/5X1.5(1)=0.3 Cum(1 Bag of Cement=50 Kgs=1.235
Cft=0.035 Cum)
Then 0.3 /0.035=8.57 bags=428 kgs

Sand=1/5X1.5(1)=0.3 Cum=10.584 Cft

Aggregates=2/5X1.5(1)=06 Cum=21.168 Cft

Is This Answer Correct ?    53 Yes 172 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building

2427


Civil engineering material testing Standard results

2349


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1962


How to design staircase.plz tell me formula for the design the staircase.

1952


how to calculate quantity of bricks in circular manhole with examples.

5682


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

2377


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1751


What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

2029


how to check and keep control on the wastage of material at site

2347


What is the snap size in civil and how can we create it?

2755


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2744


Concrete cover for slab, column, beam and footing?

1085


length where bent up is made in slab of bridge from one end

1917


How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

2077


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

2136