Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is periode of deshuttering for different area of slab

Answers were Sorted based on User's Feedback



what is periode of deshuttering for different area of slab..

Answer / saiprasad malandkar

Deshuttering time as per IS-456-2000


 IS 456-2000,clause-11.3.



Type of Formwork minimum period

a) Vertical formwork to columns, walls, beam 16-24 h

b) Soffitformwork to slabs (Props to berefixed immediately afterremoval of formwork) 3 days

c) Soffitformwork to beams (Propsto be refixed immediately afterremoval of formwork) 7 days

d) Propsto slabs: 1) Spanning up to 4.5 m 7 days
2) Spanning over4.Sm 14days

e) Props to beams and arches: 1) Spanning up to 6 m 14 days
2) Spanning over6 m 21 days

Is This Answer Correct ?    49 Yes 0 No

what is periode of deshuttering for different area of slab..

Answer / santhosh kumar

basically deshuttering of slab is in depend up on the mix
propotion of the concrete.and achived strength more than
75%.
like m15 is needed for deshuttering period is 21 days
we are using m20,for slabs need 14 days is enough.
in beams we are using m20 and above 10 ~14 days are
applicable in practcial.

for using post tension in the slab we are using m35
concrete in slabs it is deshutttered 7 ~ 8 days.(when the
portion is after stressed)
to calculate the concrete strength in lab take 3 cube of
concrete and tested in lab 3 cube average strength is
needed 75%.

Is This Answer Correct ?    59 Yes 12 No

what is periode of deshuttering for different area of slab..

Answer / nikunj faldu

yas, santhosh kumar statment is right, but that depend up
on span of slab also, bcos. the dead load of slab is bigest
fector efecting on deshuttering.
than second, almost people remove shuttering below the slab
and beam bottom are stay long time, unother give a support
on bottom and remove shutter, that's all right.

one more sugetion is if that wall shuttering so, u must be
remove after 24 to 36 hours.

Is This Answer Correct ?    26 Yes 4 No

what is periode of deshuttering for different area of slab..

Answer / harbans singh

It is also depends on whether in cold deshuttering required
more time.

Is This Answer Correct ?    3 Yes 1 No

what is periode of deshuttering for different area of slab..

Answer / nitin patil

What santosh kumar given answer is correct.but sometimes it is observed that for M20 grade slab deshuttering is done in 7-8 days.it depends on the material used also.

Is This Answer Correct ?    2 Yes 0 No

what is periode of deshuttering for different area of slab..

Answer / benny joseph

Solid slab 30cm thick x 1000 m2 deshuttering shall be how many days of after casting ( slab mix opc 380kg) 7days curing

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

How much quantity of steel will be used for commercial building consists of ground floor shops, first floor shops, second floor will be for offices and third floor will be office/banks. How many tons of steel is required to construct this building.

3 Answers   CRPF,


how to calculate spacing rod in column

0 Answers  


I've one slab of 24m x 43m. How to calculate required steel For this slab.

5 Answers   Reliance,


what grade of concrete to be used for lintel when reinforced with bamboo in place of steel?????????

2 Answers  


define curing? what is the necessity of curing?

3 Answers  


Lapping Work Explain Briefly

2 Answers  


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

0 Answers  


1 cft have 13.5 No of Bricks, can someone help me to answer me for it's mathematically proof?

2 Answers  


Define polar co ordinates.

0 Answers  


how much % of cement can be replaced by flyash ....

4 Answers   L&T,


Define What is passive earth pressure ?

0 Answers  


Which is the latest version of solidsworks?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)