what is periode of deshuttering for different area of slab

Answer Posted / nikunj faldu

yas, santhosh kumar statment is right, but that depend up
on span of slab also, bcos. the dead load of slab is bigest
fector efecting on deshuttering.
than second, almost people remove shuttering below the slab
and beam bottom are stay long time, unother give a support
on bottom and remove shutter, that's all right.

one more sugetion is if that wall shuttering so, u must be
remove after 24 to 36 hours.

Is This Answer Correct ?    26 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

States some of the commonly used commands in cad software’s?

771


give me the mix proportion for design mix concrete M 7.5 grade 1:4:8

3612


How much cum. Brick work can do by 1 madon

1185


I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs

2066


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

1646






What is the tensile strength of wood?

665


whats is difference between anchorage length and development length

1378


Explain creep?

695


What is the outturn of Ceiling plastering

2860


What is the snap size in civil and how can we create it?

2308


Which prize is the alternative to the NOVEL Prize?

1886


what does the track parameter mean in staad.pro?

5468


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

1781


how gradation of aggregates effect on slump of fresh concrete?

1833


How much cement and water required for cement selery????

1427