what is periode of deshuttering for different area of slab
Answer Posted / harbans singh
It is also depends on whether in cold deshuttering required
more time.
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Describe the various methods of concrete curing?
Which are the Steel tests ?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
How to hide dimensions in autocad?
it is possiblee to produce concrete with out cracks...
What is rate of concrete surface rendering work per sqm
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
how calucate cement sand ratio for plstering
The mixture of different ingredients of cement is burnt at?
how to control PQI (Project Quality Index)
In which code the the maximum height of concrete casting has been explained