what is periode of deshuttering for different area of slab

Answer Posted / harbans singh

It is also depends on whether in cold deshuttering required
more time.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1373


Describe the various methods of concrete curing?

686


Which are the Steel tests ?

741


what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?

2109


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1594






How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1792


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

1560


How to hide dimensions in autocad?

641


it is possiblee to produce concrete with out cracks...

1484


What is rate of concrete surface rendering work per sqm

1439


I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent

1784


how calucate cement sand ratio for plstering

1510


The mixture of different ingredients of cement is burnt at?

1107


how to control PQI (Project Quality Index)

9844


In which code the the maximum height of concrete casting has been explained

2338