primary treatment of sewagw consist of
removal of floating materials
removal of sand & grit
removal of organic materials
all above
No Answer is Posted For this Question
Be the First to Post Answer
how many hacking to be made in one sqft for concrete surface before plastering as per the IS Code
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
will fix foundation bolts at site with out template is there any procedure?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is called fck
what is Quality Reporting?
List out the types of roofs?
what is the least count of Total station
What is the difference between NP2 and NP3 Class RCC Hume Pipes
5 Answers Honest Derivatives Pvt. Ltd, Indian Hume Pipe Co, M2K,
How much is the curing time period?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
0 Answers Civil Service, Intelinet, Marg, PMC,
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?