what is periode of deshuttering for different area of slab

Answer Posted / santhosh kumar

basically deshuttering of slab is in depend up on the mix
propotion of the concrete.and achived strength more than
75%.
like m15 is needed for deshuttering period is 21 days
we are using m20,for slabs need 14 days is enough.
in beams we are using m20 and above 10 ~14 days are
applicable in practcial.

for using post tension in the slab we are using m35
concrete in slabs it is deshutttered 7 ~ 8 days.(when the
portion is after stressed)
to calculate the concrete strength in lab take 3 cube of
concrete and tested in lab 3 cube average strength is
needed 75%.

Is This Answer Correct ?    59 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1156


How much cement,sand,bricks and water needed for 1square metre brick work?

1344


What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

1341


what is the clear cover for shearwall?

1064


How do you change a dimension value in solidsworks?

781






An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.

1555


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2123


Wat is meant by Aecron brick?

1655


How many feet are in 4 square yards?

729


What is the origin of name railway sleepers?

844


What is the force exerted by the tacoma narrows bridge?

742


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

1458


I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?

2091


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

2647


Minimum and maximum size of the building components

1773