what is periode of deshuttering for different area of slab
Answer Posted / santhosh kumar
basically deshuttering of slab is in depend up on the mix
propotion of the concrete.and achived strength more than
75%.
like m15 is needed for deshuttering period is 21 days
we are using m20,for slabs need 14 days is enough.
in beams we are using m20 and above 10 ~14 days are
applicable in practcial.
for using post tension in the slab we are using m35
concrete in slabs it is deshutttered 7 ~ 8 days.(when the
portion is after stressed)
to calculate the concrete strength in lab take 3 cube of
concrete and tested in lab 3 cube average strength is
needed 75%.
| Is This Answer Correct ? | 59 Yes | 12 No |
Post New Answer View All Answers
How to calculate Volume of Wet cement concrete for a specific grade?
give me the rate analysis for Bituminous Macadam and SDBC
HOw much % of premium on DSR-2013 currently
how much of the strength comes from post-production curing
how to create our resume?
what is the difference between tsp & tower
What are the different types of runners?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
Can we use concrete of slump cone in cube casting in which we have already measured slump?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
What is the per cu. mt. price of ready mix in Gujarat region.?
how to calculate reinforcment in staircase cranked beam?
What are the applications of cad?
How to arrive dry volume of concrete (1.52 to 1.57) ?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?