how to design an isolated footing having load and moment
acting on the column also draw pressure diagram at the base
Answers were Sorted based on User's Feedback
Answer / nsureshbabu
give me u r email id
i will send the clear notes
| Is This Answer Correct ? | 22 Yes | 12 No |
Answer / iqbal sharma
my email id is alpha_iqbal@yahoo.com
sir,kindly send me the clear notes
| Is This Answer Correct ? | 11 Yes | 4 No |
Answer / prashant t. khandekar
Sir Please send the detils step of Isolated combined Footing
on MY email id prashant_khandekar@hotmail.com
| Is This Answer Correct ? | 4 Yes | 3 No |
Answer / syed ali
Kindly send me the answer & if possible please display on
net to also see by others (without pressure diagram).
Sometime there is no time to ask by through email & get
reply.
Thanks a lot.
syed.ali_sp@yahoo.com
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / imran
my e mail id is immu_sam2000@yahoo.com plzzzzzzzzzzzzzzzz
send me the notes
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / rahul nag
My email I'd.
Rahulnag127@gmail.com
Send me the answer
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / cydee steve gonzales
this is my email address: cag_gonzales@yahoo.com and
cydee.gonzales@rohnproducts.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / aviraj kajave
sir ,i kindly request to send me clear notes.
| Is This Answer Correct ? | 0 Yes | 0 No |
How to do BBS for Chair Rod?
clean earthing and dirty earthing
1 Answers CSCEC-China State Construction Engineering Corporation,
what is the size of moduler bricks
how to caculate cutting lenght in bar bending schedule for 180 degree bend
What is construction joint and expansion joint in CC pavements
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
material requred for 1 square foot lanter with formula
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
How to correct a column which don't have sufficient cover?
1. why we use inverted beam ? 2.why we use extra bar in beam ? 3.dimension in L-bar in column ,footing and beam
what is the theoritical percentage of concrete cubes testing per day?
say the propotions of different concrete mix desidn(M20 M15 M25 M25 M30)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)