how to design an isolated footing having load and moment
acting on the column also draw pressure diagram at the base
Answer Posted / haresh
please send me result
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
HOw much % of premium on DSR-2013 currently
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
how can i calculate cement in brickwork
What is the Maximum %age of Steel in columns and beams ?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
How many square meter can a worker/labor demolish a structure per day?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
How much quantity water should be placed in one cubic meter area?
Forces in a Shear Wall are in plane or out of plane ?
why does the most of civil engg is not intersted to going for teaching field?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
How much cement will require for 1Rmt Skirting laying
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,