can u plz send me ntpc placement papers(civil engineering)
at mohit_verma21@yahoo.com
No Answer is Posted For this Question
Be the First to Post Answer
Is there any possibility of changing in dia of bar from lower to higher (i.e Lower dia bar at bottom and Higher dia bar at top)
what is the real de-shuttering time for rcc column,slaband wall
how much least count of levelling ?
describe about Hollow bricks? where the hollow brick "ll use& what"s the purpose?
What are the types of test used to determine soil bearing capacity
What are the specification of good quality sand for plaster and brickwork?
What is the purpose of the gap in the road on this bridge?
what is mean by "SQP"
Are you having any structural design experience?
4 Answers Ajnara Group, Jeyam Homes, L&T,
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
after temping in cbr mould keep how many hours mould in water
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)