We have received supplies of the ordered material. payments
against the supplies also released. Where ST paid 4%
against form C. Meanwhile it has been observed that 25% of
material supplied was defective. Please suggest whether the
issuance of C form from our side would be stopped till
settlement of liabilities.
No Answer is Posted For this Question
Be the First to Post Answer
Is it necessary to install Lighting Arrester on both side side (i.e HT and LT) of Transformer in a transmission substation? if yes Why on both side?
What is the difference between UPS and SMPS?
how we calculate fault current& load factor or fault level&also the leakage current
What is the ampereage of .75 ton Ac
what is the difference between mho characteristics and quadrilateral chara in distance protection
Difference between on line capacitor and Station type capacitor.
why the earth terminal of the three pin plug we are using bigger than the others?
what is the criteria for selection of conductor used for ehv ac electrical dischrge
0 Answers National Productivity Council,
why our indian system choose the 230 volt for single phase&415 for 3-phase voltage,in forign side 110 volt is used what is the difference
A Generator is in running condition and Rotor earth fault alarm is coming.How to check on line(i.e in running condition) whether there is actual earth fault in rotor or not.
How does one convert an AC motor into a generator?
What will happen when we connect 2 bulbs in series between 2 phases