please,
Send me last technical test question paper in my email id..
No Answer is Posted For this Question
Be the First to Post Answer
Can we use all 3 cores of a cable to connect DC motor + ve terminal and similarly one more cable for - ve terminal.
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
if we appling capacitor at above rated what are looses and what will be happen
4 Answers Radiant, Real Estate,
what law motor works?
why rotor resistance starter is not suitable for squrielcage induction motor?why it is suitable for slipring induction motor?
What safety precaution are to be taken for avoiding electric hazards ?
Why cpaciter opposes sudden changes in voltage?and how?
how to calculate the mf of kwh meter,if ct the ratio on meter is 100/5A
In ACS 1000 drive we used 12 pulse convertor.Why dont used 6 pulse or 3 pulse convetor
why is a power transformer used only occasionally?it is used to step up at generating stations?and that needs to be done all day long !!!!!!!
Wat wil happen if Transformer is operated at 100 HZ Frequency?
why fault current always calculated for 1 seconds?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)