At present how many HVDC lines are there in india
Answers were Sorted based on User's Feedback
Answer / guest
at present in india there are three HVDC transmission lines
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rehand to delhi (1500 MW at ±500 kV DC)
3)talchal to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)
5)bishwanath to agra(4000 MW)
Is This Answer Correct ? | 383 Yes | 72 No |
Answer / rajat kumar
at present in india there are three HVDC transmission lines
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchal to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)
5)bishwanath to agra(6000 MW)
Is This Answer Correct ? | 145 Yes | 37 No |
Answer / ashish pankaj singh
presently there are 3 hvdc lines in operation and three
more lines in progress ie mundra- mohindergarh, ballia -
bhiwadi, bishwanath-agra.
one more hvdc project ner agra is in bidding state.
Is This Answer Correct ? | 65 Yes | 26 No |
Answer / unwaba
1.rihand-dadri
2.talcher-kolar
3.chandrapur-phadge
4.sasaram (back to back) going to shift to kolhapur
5.vindhyachal (back to back)
6.ballia-bhiwadi(first pole charged on 31st march-2010)
7.ner-agra(proposed)
Is This Answer Correct ? | 48 Yes | 17 No |
Answer / expert
at present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchar to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)-first pole charged as of 31st
March 2010
5)Mundra-Mohindergarh(Adani group-first Indian private
HVDC)-in progress,completion by 2011 end.
6)Bishwanath/Chariali to Agra(6000 MW)-recently awarded to
ABB-BHEL
Is This Answer Correct ? | 41 Yes | 15 No |
Answer / manoj kumar
1-Rihand to Delhi (Dadri) 1500MW
2-Talchal to kolar (2500 MW)
3-Chanderpur to Padghe (Mumbai)
Project in Progress
4-Ballia to Bhiwadi (2500MW)
5-Bishwanath to Agra (6000MW)
6-Mundra to Mohindergarh
Is This Answer Correct ? | 23 Yes | 9 No |
Answer / gandhi pratik
at present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchar to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)-first pole charged as of 31st
March 2010
5)Mundra-Mohindergarh(Adani group-first Indian private
HVDC)-in progress,completion by 2011 end.
6)Bishwanath/Chariali to Agra(6000 MW)-recently awarded to
ABB-BHEL
Is This Answer Correct ? | 20 Yes | 13 No |
Answer / sumit tiwari
1.Back to back at rehand
2.Singrauli- Delhi
3.Ramagundam-Chanderpur
4.Visakhapatnam-Araku
5.Barsoor-Sileru
6.Bihar shariff-Mau
Is This Answer Correct ? | 1 Yes | 0 No |
Why 5kv megger used to megger 6.6kv motor or 33kv transformer why not 500v?
What is the difference between reciprocating & rotary motors in AC units, which is the best one in terms of operation.
armature winding of dc machine produce alternating emf then it convert in to dc by using commutator.But only we consider armature resistance why don't we consider inductive reactane effect?
WHAT IS REMOTE CONTROLLED DG? WHAT IS DIFFERENCE BETWEEN REMOTE CONTROLLED DG & NORMAL DG SETS
how the frequency was generated in power station
why supervision relay is used in incoming feeders?
can we coorect P.F. OF 320 KVA ALTERNATOR AT LOCAL SITE WITH RATED .8 PF LAGGING.
What is the gross weight to copper ratio in slip ring induction motor of 4000 HP,6.6 kv, 372amp, 992 rpm GE motor.
Dear Mr B C pal...Can you plz. put some light on principle of operation of Z-Ct in conjunction to its use with 1Cx1000Sqmm HT Cables & Directional Ground Fault / Over Voltage Relays...Regd..Parag v K 9899115632
what is difference between earhing and neutral
Why is making current of CB always greater than CB breaking burrent?.
what are all the components required to assemble solar panel other than pv cell?