at present in india there are three HVDC transmission lines
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rehand to delhi (1500 MW at ±500 kV DC)
3)talchal to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)
5)bishwanath to agra(4000 MW)
Is This Answer Correct ? | 383 Yes | 72 No |
Answer / rajat kumar
at present in india there are three HVDC transmission lines
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchal to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)
5)bishwanath to agra(6000 MW)
Is This Answer Correct ? | 145 Yes | 37 No |
Answer / ashish pankaj singh
presently there are 3 hvdc lines in operation and three
more lines in progress ie mundra- mohindergarh, ballia -
bhiwadi, bishwanath-agra.
one more hvdc project ner agra is in bidding state.
Is This Answer Correct ? | 65 Yes | 26 No |
Answer / unwaba
1.rihand-dadri
2.talcher-kolar
3.chandrapur-phadge
4.sasaram (back to back) going to shift to kolhapur
5.vindhyachal (back to back)
6.ballia-bhiwadi(first pole charged on 31st march-2010)
7.ner-agra(proposed)
Is This Answer Correct ? | 48 Yes | 17 No |
Answer / expert
at present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchar to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)-first pole charged as of 31st
March 2010
5)Mundra-Mohindergarh(Adani group-first Indian private
HVDC)-in progress,completion by 2011 end.
6)Bishwanath/Chariali to Agra(6000 MW)-recently awarded to
ABB-BHEL
Is This Answer Correct ? | 41 Yes | 15 No |
Answer / manoj kumar
1-Rihand to Delhi (Dadri) 1500MW
2-Talchal to kolar (2500 MW)
3-Chanderpur to Padghe (Mumbai)
Project in Progress
4-Ballia to Bhiwadi (2500MW)
5-Bishwanath to Agra (6000MW)
6-Mundra to Mohindergarh
Is This Answer Correct ? | 23 Yes | 9 No |
Answer / gandhi pratik
at present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchar to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)-first pole charged as of 31st
March 2010
5)Mundra-Mohindergarh(Adani group-first Indian private
HVDC)-in progress,completion by 2011 end.
6)Bishwanath/Chariali to Agra(6000 MW)-recently awarded to
ABB-BHEL
Is This Answer Correct ? | 20 Yes | 13 No |
Answer / sumit tiwari
1.Back to back at rehand
2.Singrauli- Delhi
3.Ramagundam-Chanderpur
4.Visakhapatnam-Araku
5.Barsoor-Sileru
6.Bihar shariff-Mau
Is This Answer Correct ? | 1 Yes | 0 No |
15hp motor wound by 0.9mm & 0.95mm magnet wire. at no load test it draw 4.2A current. Another motor with same condition draw 9.2A current. How can that occur? pls help
What is power factof?
how to calculate the kw, Amps consumed by a capacitor, give me the formula for KVAr into capacitance,KVAr into KW & KVA, Amps
Sir, plz tell me the relation b/w KW and frequency in Variable frequency Drive?
what is the meaning of WYE and DELTA in Electric meter?
Why PT burnts?
What is the difference between Split ring and slip ring?
Who are the manufacturer for Nitrogen based Fire Protectio/explosion prevention for Oil Filled Transformers? India and international both?
I have done my m.tech in electrical engg discipline. Can any one please suggest me how should I prepare for getting into phd in iit or nit.How should I prepare for getting into lecturership
It is used or not HT cable single core 630 sqmm in LT 3 phase capacitor bank which is used in PCC(power control center).
Why transformer ratings in KVA not in KW?
Difference between 3.5 core and 4 core