At present how many HVDC lines are there in india
Answers were Sorted based on User's Feedback
Answer / guest
at present in india there are three HVDC transmission lines
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rehand to delhi (1500 MW at ±500 kV DC)
3)talchal to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)
5)bishwanath to agra(4000 MW)
| Is This Answer Correct ? | 383 Yes | 72 No |
Answer / rajat kumar
at present in india there are three HVDC transmission lines
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchal to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)
5)bishwanath to agra(6000 MW)
| Is This Answer Correct ? | 145 Yes | 37 No |
Answer / ashish pankaj singh
presently there are 3 hvdc lines in operation and three
more lines in progress ie mundra- mohindergarh, ballia -
bhiwadi, bishwanath-agra.
one more hvdc project ner agra is in bidding state.
| Is This Answer Correct ? | 65 Yes | 26 No |
Answer / unwaba
1.rihand-dadri
2.talcher-kolar
3.chandrapur-phadge
4.sasaram (back to back) going to shift to kolhapur
5.vindhyachal (back to back)
6.ballia-bhiwadi(first pole charged on 31st march-2010)
7.ner-agra(proposed)
| Is This Answer Correct ? | 48 Yes | 17 No |
Answer / expert
at present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchar to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)-first pole charged as of 31st
March 2010
5)Mundra-Mohindergarh(Adani group-first Indian private
HVDC)-in progress,completion by 2011 end.
6)Bishwanath/Chariali to Agra(6000 MW)-recently awarded to
ABB-BHEL
| Is This Answer Correct ? | 41 Yes | 15 No |
Answer / manoj kumar
1-Rihand to Delhi (Dadri) 1500MW
2-Talchal to kolar (2500 MW)
3-Chanderpur to Padghe (Mumbai)
Project in Progress
4-Ballia to Bhiwadi (2500MW)
5-Bishwanath to Agra (6000MW)
6-Mundra to Mohindergarh
| Is This Answer Correct ? | 23 Yes | 9 No |
Answer / gandhi pratik
at present in india there are three operating HVDC
transmission lines(not including B-to-B)
1)chandrapur to padghe(mumbai)--(1500 MW at ±500 kV DC)
2)rihand to delhi (dadri)(1500 MW at ±500 kV DC)
3)talchar to kolar (2500 MW)
and projects in progress are:
4)ballia to bhiwadi(2500 MW)-first pole charged as of 31st
March 2010
5)Mundra-Mohindergarh(Adani group-first Indian private
HVDC)-in progress,completion by 2011 end.
6)Bishwanath/Chariali to Agra(6000 MW)-recently awarded to
ABB-BHEL
| Is This Answer Correct ? | 20 Yes | 13 No |
Answer / sumit tiwari
1.Back to back at rehand
2.Singrauli- Delhi
3.Ramagundam-Chanderpur
4.Visakhapatnam-Araku
5.Barsoor-Sileru
6.Bihar shariff-Mau
| Is This Answer Correct ? | 1 Yes | 0 No |
what do u mean by knee point voltage?
some ac motor's direction get change dueto ghanging input to the ac drives.(say ryb to rby). but some motor direction remains the same when phase sequence is changed fromdive side. can anybody guide me?
If I bring a basic electric meter from the States and hook it up in Costa Rica in a development that has only one transformer for the 50 homes, will it still be accurate regarding the usage of kilowatt hours?
I have raw material for making Compact-Choke for flourscent lamp of 40 Watts. We are suppose to get 0.4 amps output at end. but we are getting 0.42 or 0.44 amps and above. We have done many testings in different but nothing worked out. Please suggest me how to get the correct output. We are using 1. core winding of 700 windings of aluminium 2. E-shape iron fillings and I-shape iron fillings to surround the winding.
can we amplify dc signals.how can it be done
Explain the working of any one cutting machine
0 Answers Mahatma Gandhi University,
What is oscillator circuit?
Difference between a pilot wire and a normal conductor?
0 Answers United Arab Aluminum Company,
Can u explain : how capacitor act when the supply is given is a.c and d.c. I know that when d.c supply is given then the capacitor charges and becomes open circuited. But please say about when a.c is given. I have seen that when a.c supply is given ,it charges and discharges, But when we plug in capacitor to our daily supply and take it out ,then we join those wires spark will appear,which seems charge is present ,but when a.c is given it should charge and discharge
Am i eligible to get electrical supervisor licence? As i did diploma as well as degree in Electrical Engg. in June 2011. Now i am working in 15 MW Power plant from 2 mnths. i belongs to Maharashtra.
what is the speed of a turbine in an hydroelectric power station and how many poles does it have...?
what happen if the parallel generator phase angle shift by 1 degree in manual mode
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)