Answer / amit3456
There r so many factors for selection of cable:
1. full load of equipment or load.
2. Length of cable.
3. Derating factor.
4. Insulation level
| Is This Answer Correct ? | 34 Yes | 8 No |
cable size primarily depends on its voltage rating or kW
rating of load. From the kW rating, we can calculate the
current that should be carried by cable and the number of
runs required. we also have to calculate voltage drop
during starting and running in case of a motor load.
| Is This Answer Correct ? | 37 Yes | 18 No |
Answer / ranjan
For sizing of any feeder following are required:-
1. The load for which we are sizing
2.Dearating factor
3.pf
4.Starting voltage drop
5.running voltage drop
6.Spacing/Touching factor
7Effeciency
| Is This Answer Correct ? | 14 Yes | 3 No |
Answer / d.k.kakade
If cable size calulate on load in Amps.basis then please
give the formula, or advice cable size in 3.3kv 104Amps and
52 Amps,67 Amps, 33 Amps, and 15 Amps load.
Powe engrs.
| Is This Answer Correct ? | 10 Yes | 2 No |
Answer / eng.yousef
cable size depends on:
1)total connected load via cable.
2)lenght between the source and the load.
3)temprture
4)isulator type
5)load type
6)wiring place& type
| Is This Answer Correct ? | 16 Yes | 13 No |
Answer / ch.venkateswra rao
first we consider the type of load,voltage
rating,location,power etc will be known after that we
calculate the in put current and 20% extra value will be
added to that currnet and based on that current we refer
the cable manufacture booket and select the suitable size
of the cable
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / rathinam
My point of view, To find the cable size need to divide the
LOAD CURRENT by 3.
i.e:
Cable size= Load current (10A)/ 3
= 3.3
Now the answer is 3.3, But we don't have the 3.3 size of
cable. so we can choose next related size of cable, which
is 4 sq.mm.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / manishhctm
A) Firstly we have to check for wht type of system we require the cable i.e LV, MV, HV AND EHV
B) then we have to calculate first: the rated current required by load on 3phase or 1phase system i.e
1) For 3-Phase System
KVA= KW/SQRT3*PF
2) For 1-Phase System
KVA=KW/PF
C) In companies there is feeder schedule for every type of cable w.r.t the amp.
Enjoy!
| Is This Answer Correct ? | 3 Yes | 5 No |
I want to measure resistance between Neutro and earth conductor for 3 phase Transformer what should i do
Then what do you call a transformer that is installed on the ground?"
If the rank of a (5x6)matrix Q is 4, then which one of the following statements is correct ?
how many load we can take for lighting
If a shunt Dynamo has induced emf 100V and 0.4 ohm resistance and battery of accumulator of open circuit emf 110V and 0.5 Ohm resistance are in parallel what is common terminal potential difference?
1.Can anybody explain Why starters are not used for motor starting in industries? 2.
What must be the distance between the Earth pit which are grounded from two different sources. Example: Distance between the earth pit for LV Panel-1 & 2
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING) I O (current operating)?
why core losses and copper losses does not depend on power factor?
when power transformer is flashed which gas is produce in side?
WHAT HAPPENED HT MOTOR FEED WITH LT SUPPLY
What will happen if the field of synchronous generator is removed when it is in operation with no load?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)