Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How can w select the cable size for different rating load
& also waht r factors affecting the during selection of
cable?

Answer Posted / manishhctm

A) Firstly we have to check for wht type of system we require the cable i.e LV, MV, HV AND EHV
B) then we have to calculate first: the rated current required by load on 3phase or 1phase system i.e

1) For 3-Phase System
KVA= KW/SQRT3*PF
2) For 1-Phase System
KVA=KW/PF

C) In companies there is feeder schedule for every type of cable w.r.t the amp.

Enjoy!

Is This Answer Correct ?    3 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi all i like to know vat is power plot in control systems also i want to know abt latest trends in electrical & electronics

2011


What it the purpose of parallel phasing transfomers??

2045


Comparision of Air break circuit breaker, SF6 Circuit breaker and vacuum circuit breaker.

2423


How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.

2050


How to assume answer to electrical questions

1578


what is the difference between STAR and DELTA connection and application wise how it can be utilizedd

2261


what is meant by power and distribution transformer ?

2055


what is the preventive maintence for ht panels and busbars and vcb abd acb's.

2433


working of diesel generator ?

1900


Hi, My plant daily consumption is calculated as 3.8MWH but my supplier has sanctioned an power of 2.6MW per day. how can i equal or distinguish this two factors

1952


if main CT is of ratio 50/5, and meter CT is -/5 what will be overall multiplying factor of meter.PT is 11000/110 .

1713


what is the responsibility of C license holder in industry?

9222


Is there chopping current in resistive circuit

2014


how to calculate the conductor size for certain KV transmission line and distribution line?

2597


How to define Kirchhoff current law and voltage law along with simply examples.

1823