Why used in layer by layer charcoal and salt used in earth
pits.
Answers were Sorted based on User's Feedback
Answer / raj
The salt and charcoal is added in earthing pit to lower the resistivity of the soil. The salt and charcoal have good ionic behavior and reduce the soil resistance. The lower earth resistance is must to quickly pass the earth fault current to ground.
Read More:
https://www.cselectricalandelectronics.com/question/why-salt-and-charcoal-are-added-in-earthing-pit/
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the main difference between simplex RTD and Duplex RTD?
what are factors to be consider to design a HT & LT motor?
how manyunits consumed by 25 kvar capacitor bank
What is power factor?How to improve power factor
Is CBCT protect human life? If yes than how?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
sir please send me techinical questions for junior engineer posting in bangalore railway i am diploma holder
How to Calculate Contracted Maximum demand using motor Hp or Current
Difference between divercity and power factor
transmisssion type
why grid frequency varry time to time?
State the function of control rods used in nuclear reactor
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)