Why used in layer by layer charcoal and salt used in earth
pits.
Answers were Sorted based on User's Feedback
Answer / raj
The salt and charcoal is added in earthing pit to lower the resistivity of the soil. The salt and charcoal have good ionic behavior and reduce the soil resistance. The lower earth resistance is must to quickly pass the earth fault current to ground.
Read More:
https://www.cselectricalandelectronics.com/question/why-salt-and-charcoal-are-added-in-earthing-pit/
| Is This Answer Correct ? | 0 Yes | 0 No |
transformers? power factor? machiences?
Why we use the D-curve MCBs in critical power distrubution.
derive the e.m.f equation of transformer
What is the starting current of a DC Motor?
what is differance bw ELCB and MCB. ?
WHAT IS RETARDATION TEST IN DC MACHINES?
what is pilot wire? what is the use of pilot wires?
Up to how much limit of HP of electric motor the Star- Delta Starter can be used ?
what's the difference between 'shaft power demand' and 'BHP' , when we consider electrical load list.
if 400kv line is connected to the load but neutral ii not be connceted then wt ll happen
any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?
hi friends can u tell me name of the sites where i can get animation of electrical machines......
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)