Answer / jothimani.n
There are actually two types of shelf life
1) Total shelf life
2) Minimum remaining shelf life
Total Shelf life - If total shelf life is maintained then
the minimum shelf life will also to be entered mandatory.
While taking GR for such item, it actually ask the user to
enter the Manufactured date so that the system
automatically calculates the expiry date.
Minimum shelf life - While taking the GR, it asks the user
to enter the date of GR date so that it checks whether the
days entered in material master has been satisfied.If the
condition is not satisfied then it will not allow to take
receipt for that item.
Is This Answer Correct ? | 25 Yes | 3 No |
1.The self life expiration date check must be activated for the plant and movement type in IMG.
2.In the purchase order item,make sure the remaining self life is maintained.you can enter default value for the remaining self life in material master record(General plant data/storage).
3.In these prereqisities are fulfilled,the system will request that you specify the self life expiration date(SLED) in Goods receipt.
Is This Answer Correct ? | 9 Yes | 2 No |
Answer / ganapathy
Shelf Life Item is a Matreial which has a Expiry.This will
be maintained in the material Master at Dat Storage 2
division.
The Period of Expiiry and Date of Purchase has to be
maintained for this kind of materials.After Expiry Period
the Stock will be automatically deleted for the
unrestricted use.
Is This Answer Correct ? | 15 Yes | 13 No |
Answer / siva reddy
how to find out retest and epity date in sap mm
Is This Answer Correct ? | 0 Yes | 0 No |
What is a 'factory calendar'?
What is the importance of the batch record?
What is a reference purchase organization? When can it be used?
What are some of the other erp applications available in the market?
what is meant by production version?
How can we have 2 GL accounts using same valuation class in material master ? split valuation process example we are procuring materials from two different destinations I will use same valuation class but I want two different GL accounts to be hit.
What is LSMW?
What are the settings required for quota arrangement?
How to flag a material for deletion?
Is there any procedure for amendment of power? If Pl. X-Plane?
What is the procedure to delete materials permanently from material master?
How to codify items in Material Master