After creation of schema procedure ,In vendor master i
assigned the vendor scema in Puchasing view.Then i creted a
PIR and assigned the condtions and saved.Then in ME12 when
i have deleted those condtions,Net price field in Info
Record became empty with greyout.if i want to retain my
previous Net price value How should i proceed????In FSG for
ME12 optional entry is checked.Plz guide me.
Answers were Sorted based on User's Feedback
Answer / deepak
Hi,
For retaining your previous price,you have to go to same
ME12 transaction and open the same info record.
Then go to condition, click the same condition type you
have deleted.Then go below, you will find one tab called
undo delete, after clicking that your previous net price
value will come back again in optional mode.
may be this will solve your problem.
Is This Answer Correct ? | 4 Yes | 0 No |
Even though if you delete the condition type, it will be visible but deletion check box will be selected, so, we have to select the line item and click undo button.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / priya
hi,
Firstly please check your pricing procedure table,where i
think you might have mentioned a condition type with info
record condition update,hence the system will check the
conditions available in info record,if you have put this
condition in required mode in pricing table ,then u need to
maintain the same in info record else change this specific
condition status in pricing table to statistical mode.
Is This Answer Correct ? | 0 Yes | 1 No |
What is difference between gr blocked stock and blocked stock?
what is change request?what is create request?what is own request?when coustamised data is saved a popwindow appears as promt for customisation in that 2 fields display own request n create request for what it is used?plz clarify
What are the data in material master that are maintained at the company code level?
How to handle free items in po?
Explain the 'inventory management' sub module?
how to taxes comes into picture from mm to invoice ?
Dear Sir I have one query regarding subcontracting Our firm provides blank paper to one vendor for printing work and takes it back after printing. The vendor is not sending the printed paper in a single slot, he send it in part by part. For example we send the blank paper 1000Kg for printing paper. Subcontracting vendor send it back after printing in the slot of 400 kg, 300kg and 250kg…..he tells us that remaining 50kg is wasted during printing and cutting process. We are not taking back the scarp material…we come to know finally about the qty wastage after the last qty receive and respective invoice made. So pls guide me to map this scenario in SAP. In our firm both the printed paper and blank paper lies in Raw material and raw material is non- valuated in our firm. I also tried it from my side. I created one Bom (cs01) Then I create the subcontracting Po putting the material and component provide. With cost centre and g/l account. (me21n) Then I provide the component to vendor (MB1B with mvt type – 541) Then I do the GRN for 400 and 300 and respective Invoice verification But at the time of final invoice and GRN we came to know that the qty is reduced. If we do GRN for 250kg, then the PO is still open for 50kg..And we are not taking back this 50Kg as it’s wasted during printing and cutting operations. Pls guide me map this scenario.
Can it be configured in such a way that the external requisitions can also be taken into account while MRP runs in consumption-based planning if VB is selected as MRP type?
In which condition, "Batch Management" is "deactivated" from material master? Or, why do we deactivate Batch management for a material?
A stock transfer was done between two plants belonging to same company code and between two plants belonging to different company code. What will be the difference between the two?
how to give another test sample to quality on same material after few days? pls tell me with transaction code????
Tell cut-over Process in SAP MM?