Answer / joseph
I was not satisfied by the above answers. I got this one
from sdn.sap and i have posted here.
A through gap analysis will identify the gaps between how
the business operates ad its needs against what the package
can can't do. For each gap there will be one of three
outcomes which must be recorded and actioned, GAP must be
closed and customised software can be developed close the
gap, GAP must be closed but software cannot be written
therefore a workaround is required, GAP does not need to be
closed.
In simple terms: Gap means small cracks. In SAP world. In
information technology, gap analysis is the study of the
differences between two different information systems or
applications( ex; existing system or legacy system with
Client and new is SAP), often for the purpose of
determining how to get from one state to a new state. A gap
is sometimes spoken of as "the space between where we are
and where we want to be." Gap analysis is undertaken as a
means of bridging that space.
Actual gap analysis is time consuming and it plays vital
role in blue print stage
Gap analysis is the study of the differences between two
different information systems or applications (ex; existing
system or legacy system with Client and new is SAP), often
for the purpose of determining how to get from one state to
a new state. A gap is sometimes spoken of as "the space
between where we are and where we want to be." Gap analysis
is undertaken as a means of bridging that space.
Actual gap analysis is time consuming and it plays vital
role in blue print stage.
The Gaps can differ from company to company. Most commonly,
however, missing functionality is industry-specific.
Examples
In customer master data the client requirement needs legacy
customer number which can be solved with User exit.
In sales order we need customer Phone number, we can use
user exit
If client want new field in customer master like nearest
fire station.
GAP analysis is done in Blue Print stage. It aims to
understand what can be done with the standard SAP and how
the client actually wants a particular scenario to be
processed.
It’s an understanding of the GAP between the actual &
required scenarios.
Tthe difference between agreed work and completed work is
GAP Analysis.
E.g.: To Fill This Gap, We Use The Enhancements,These
Enhancements Divided Into Exits, Like User exits, Field
Exits Screen Exits & Menu Exits.These Enhancements are used
to update the standard program in its Respective Business
Transactions, Used as a Gateway to Meet the Client
Requirements.
Is This Answer Correct ? | 23 Yes | 0 No |
Answer / shiva
Hello.
GAP analysis is done in Blue Print stage. It aims to
understand what can be done with the standard SAP and how
the client actually wants a particular scenario to be
processed. And to understand the GAP between the actual &
required scenarios.
For eg: in standard SAP there will be no Availability check
done at Quotation Level. But client requests that
Availability check be done at Quotation level also sothat
that will give him an idea roughly when the delivery could
me made (remember that doesnot transfer requirements).
Accordingly his customer can proceed with placing an order
or not as per his requirement.
Please correct me if I am wrong
Is This Answer Correct ? | 27 Yes | 5 No |
Answer / subha
HI All
In short let me tell you .Gap analysis come in
Blueprint for ASAP Meathodology when hte customer plans
to implement the sap legacy meathodology .
There will always be a situation of AS- IS and to TO - bE
Situation while customising and configuring the sap and
there will be a diffrence identifed in GAP analysis we
identify this gap and fill it in such a way the we ca
over come z situation and minimise th errors based on te
client specifucation
Is This Answer Correct ? | 6 Yes | 0 No |
GAP analysis is matching the clients requirement to the SAP
architecture.
The best example of GAP analysis is.
Business process is after the delivery, billing happens in
sap architecture.
But client specifies that he want billing to be done
before delivery.
Is This Answer Correct ? | 6 Yes | 4 No |
Answer / joseph
https://www.sdn.sap.com/irj/sdn/thread?
messageID=5605002#5605002
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / srinivas
Gap analysis is done at Blue print preparation stage.
It is the Gap of procedures the customer is following
currently and what is the SAP standard procedure.In
otherwords It is the Counsultant job to findout the GAPS in
the procedures of the customer And FILL the GAPS
effectively using SAP.
Pl correct me if I am Wrong
srinivas murthy
9448466547
Is This Answer Correct ? | 2 Yes | 6 No |
Answer / pankaj gupta
Hi,
GAP is some thing where Software consultant give BEST
business pratics to the client which is running across all
over the world and which is also support SAP application
and client is not accept the changes which is recommoanded
by consulant. So this is GAP.
All in broad way GAP is difference between software
consultant view and cilent view clesh at some point.
Make me right if am wrong.
Thanks & Regards,
Pankaj Gupta
+91 9871211226
Is This Answer Correct ? | 1 Yes | 18 No |
What is incompletion log?
Can one have multiple packing for delivery?
wat is core team. wat core team member do plz answer asap thnks
I have created a customer with Account group XXXX and also done some transactions till billing, now I want to change the account group from XXXX to YYYY. How can I change and what about the transactions already happened?
In SD, if i List and Exclude as part of Listing and Exclusytion what would be system response
Does anyone know any institute or anybody giving online access,to access their server thru GUI to practice or to work on SAP from our home?
if the end user faces a problem in doing credit note,that is he was unable to post the accounting docs in credit memo so how can we resolve it and what is reason that why it is not posting in credit memo?
what is ur role in sales document type as per ur client requirement?
In BOM suppose main item is A whose price is Rs 10000 and it is made up by 2 sub-items known as B & C whose prices are respectively rs 6000 and rs 4000 and including these two prices material A's price is rs 10000. Material B also can be sold independently but at that time that's price should be rs 7000.How it is possible?
I want to give discount on a particular item, if a specific item is purchased. i.e., for ex: if a TV set was purchased, and a DVD player also purchased by the customer, i want to give disount on the DVD player. How to set the price condition for this scenario.
Hi SD Gurus, I am applying for a position of SAP SD End user. In job description, they asked for Calender/Scheduling Experience. Could you please tell me about this Calender/Scheduling Experience in detail.Thanks in advance.
If i create a rush order for a customer but there is no stock for material available. What will be the result of it? How will no stock affect rush order?