Can you use call horizon and shift factors in multiple counter plan?
No Answer is Posted For this Question
Be the First to Post Answer
What are the activities of a sap pm?
Where does cost of capex order settled?
What do the ie05 tcodes in sap- pm mean?
I am a beginner in Sap pm.Can anyone suggest me some good website to know more abt sap pm module. If anyone has any material abt it, plz mail to my mail:- dineshsharma20688@gmail.com
what do you mean by reverse counter?
What is preventive maintenance and key submodules under this?
How many ways you can create a maintenance order in sap?
I have a single cycle maintenance plan that is triggered by a counter assigned to a equipment A. If I replace equipment A with equipment B how do I change my Maintenance plan counter? When I use IP02 "change maintenance Plan" the counter box is greyed out. Thanks for any advice.
Is it possible to enter measurement document for a measuring point without any numeric value? Such as yes/ no or ok/ not ok. How?
How to set the deletion flag to Functional location and also want to know how to hide the flagged Functional location
Suppose there is a measuring point for temperature and while recording the values of temperature there is a deviation of values from given limits? Is it possible to throw a warning or error message? What is the configuration setting available?
How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?