How many ways you can create a maintenance order in sap?
No Answer is Posted For this Question
Be the First to Post Answer
What do the ca85 tcodes in sap- pm mean?
I have a single cycle maintenance plan that is triggered by a counter assigned to a equipment A. If I replace equipment A with equipment B how do I change my Maintenance plan counter? When I use IP02 "change maintenance Plan" the counter box is greyed out. Thanks for any advice.
What are the functions of using equipment master?
I am a beginner in Sap pm.Can anyone suggest me some good website to know more abt sap pm module. If anyone has any material abt it, plz mail to my mail:-urskartik.a@gmail.com
What is the order type for breakdown maintenance?
What is shift factor? Explain with example.
What functions are determined by the category of the functional location?
What is corrective maintenance?
I have scheduled a maintenance plan but I am unable to see the all due (plan) dates of maintenance order in schedule overview. Which setting will I check in maintenance plan?
Is it possible to enter measurement document for a measuring point without any numeric value? Such as yes/ no or ok/ not ok. How?
Why cost center field is important in equipment master?
What configuration required in mm module for refurbishment process?