I have a single cycle maintenance plan that is triggered by
a counter assigned to a equipment A. If I replace equipment
A with equipment B how do I change my Maintenance plan
counter? When I use IP02 "change maintenance Plan" the
counter box is greyed out. Thanks for any advice.
How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?
What are different components under maintenance planning?
What is maintenance event builder? What are the key functions of meb?
Is it necessary to run the ip transaction code for each maintenance plan that we have scheduled ?
Is it possible to enter measurement document for a measuring point without any numeric value? Such as yes/ no or ok/ not ok. How?
Explain the refurbishment process?
What is control key?
Which are the exact sap table and field for sap pm notification status?
How pm module is integrated with mm module?
Differentiate between control keys pm02 and pm03.
Can lube routes be created in sap?
What is the use of the field “standing order”?