How system picks up pricing while doing billing?
Answers were Sorted based on User's Feedback
Answer / pradeep kavuri
it simply copies from subsequent documents by using copying
controls
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / vijay
The Pricing will be transfered from order to Billing
through copy control copying routine.
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / raj
from preceding document ,provided "pricing type" field set
properly in copy control of preceding document
(order/delivery) to billing document
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / subha
hI
THERE ARE 2 WAYS FOR DOING IT
letme explain
1. In the condtion table we give for condtion type based on
condtion element wich is further carried in the pricing
proccedure and then from there it goes to sales order based
on woch we do the dlivery .
wEHN YOU GIVE VF01 IT ASKS YOU WETEHR YOU NEED TO DO
BILLING ON f1 or f2 and based on the billing type it the
pricing also moves
2. Second meathod is siply go in for copy control order -
billing and all the values form order to billing gets
passed on to billig
SPRO- SALES - COPY CONTROL
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / rizwaan
"pricing is done at sales order level. since pricing
procedure =Sales area+document pricing procedure+ customer
pricing procedure. It is just automatically copied from
sales order,delivery.
Is This Answer Correct ? | 2 Yes | 1 No |
system determines the pricing procedure by taking the
document pricing procedure from billing document(Ex: F2)
and with other controls such as CUSTOMER PRICING PROCEDURE
and SALES AREA.
we can maintain DOCUMENT PRICING PROCEDURE at 2 areas, such
as
1. sales document header, Ex: OR
2. Billing document, Ex: F2
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nandu
hi..frndz.
"pricing is done at sales order level.we want dafault
pricing in sales order for that we need to go pricing
procedure determination t.code ovkk.standard pricing
procedure is rvaa01 assigin in the combination of sales
org,dist. channel,division,customer pricing
procedure,document procing procedure.(or) In pricing t.code
v/08 here we will check pr00 is mandatory or not.
we want pricing at billing level it simply copies from
subsequent documents by using copying
controls..
if i wrrong correct me plz.....
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ravi chandra grandhi.
Yes , But with this we have to create document Priciong
procedure and this three i.e Customer pricing procedure +
document pricing procedure+ Sales are =Pricing procedure
determination.
But Question is that How system picks up pricing while
doing billing?
So system picks the price through the access sequence which
was assigned to condition typye and which was attached to
pricing procedure.......
I will clear
Condition record will be created as a condition tables.
which has got different conditions for price variation.
And this this condition tables will be arreanged in
sequence in acces sequence , This acces sequence will be
assigned to condition type and finally this type of
conditions will be formed as a pricing procedure. and you
know that this will be attched to Customer pricing
procedure + document pricing procedure.
I hope you understood the pricing procedure.
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / rizwaan
"pricing is done at sales order level. since pricing
procedure =Sales area+document pricing procedure+ customer
pricing procedure. It is just automatically copied from
sales order,delivery.
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / sap
through document pricing procedure assignment with the
billing types transaction code is ovtp.
Is This Answer Correct ? | 0 Yes | 2 No |
What does a/c group control customer?
What makes a customer a Sold-to? How can you check?
Explain the term "fit gap analysis"?
What is solution manager?
What is a sales deal and how to configure it?
Some BBilling Questions 1) Whether Billing update the document flow & billing Status? 2) Can you change proposed Billing Type (Froom Sales Order) while creating Billing Document? 3) Can you use an Invoice to refer an order and delivery at the same time? 4) Can you generate debit and credit memo with reference to delivery? 5) When you process an invoice correction and you change the quantity, the system also update the stock quantity and value in the balance sheet. Is this true or false? 6) Should you create delivery after cash sales or not? 7) With delivery related billing the system will copy only data from delivery or both sales order + delivery? 8) Whether SAP system allows you to include both order related items & delivery related items on the same billing document? 9) Which can be changed before an accounting document is created? *Billing Date *Pricing date *Billing Value *Account Determination *Output determination 10 ) How you can identify in Billing whether it is order related billing or delivery related Billing? Rajiv Trivedi SAP-SD
What is the client-specific data?
what is Idocs and status?
In a Third party Sales order process company is not delivering the goods directly to the customer so why there is need to do Goods Receipt Process T-code :(MIGO) transaction in SAP as there is no physical delivery of goods is taking place in Company? Even if we are doing it symbolically in SAP system then the stocks are going to pile up, so why we need to do MIGO transaction. Tell me the logic behind it? Please reply asap... Eagerly awaiting for your response? Thanks in advance.
What is the structure of delivery document? What are the characteristics essential for combining more than one sales order as one outbound delivery?
What is backorder processing or partial delivery?
tell me the business processes you map ? and its configuration