What is the transaction code to run MRP for sales order?
No Answer is Posted For this Question
Be the First to Post Answer
Difference between plan cost, Actual cost and target cost.
Difference b/w Co-product & by-Product
How do you do capacity planning ?
SPRO path for order, confirmation or requirement class.
What are gaps? Some examples?
What is Material status and which view of the material master it is available?
What MRP does with Capacity overload
What is MRP Profile and MRP Group?
what are the basics of PP ?
What are basic dates?
Mention how mrp (material requirement planning) types are classified?
Mention what is the difference between stock transport order and stock transfer order?