What is planning time fence and where will be reflect
it is the period in which no changes to the plan happens automatically through MRP run (depending on the firming type).
it reflect in MD04 (stock/requirement list)
Is This Answer Correct ? | 0 Yes | 0 No |
Do you need to use different BOMs for different applications, such as Production, Engineering, Plant Maintenance, and Costing (BOM usage)?
Mention what are the types of master views for production and planning?
Difference between MD04 and MD05.
Both labor and machine categories exist. How would you calculate the process time?
What are different MRP types?
Explain the gaps and the steps involved in them.
Can't one material be assigned to more than one operation in a routing?
Difference b/w Co-product & by-Product
Mention what is the t-code for changing production order and to display production order?
Can we create a production order without BOM and Routing?
If production order released for 100 pieces you done GR for 50 pieces and technically closed, after some days you can do GR for 50 pieces
How to create prt master records?