Explain Planning file entry.
i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
What are the lot size you have used?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What is requirement class and requirement type?
What is planned consumption and unplanned consumption?
Have you used Pull list or back flushing in REM?
PLease send Me SAP-PP Interviw Questions and FAQ's.
What is Auto GR?
Explain the mrp group and their uses.
Consignment matl how will be use
Explain the mrp controller and their uses.
what is alternative item group