i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
Answers were Sorted based on User's Feedback
Answer / tim_coorgi
We have to define MRP storage location indicator as 1 for that storage location.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / arun k
in mrp4 view we need define the mrp storage locattion indicator as 1
Is This Answer Correct ? | 0 Yes | 0 No |
in sap system, how to get production order record! example:i want to know who lock my production order!
What is a ‘routing’ in pp?
What is finite scheduling?
can any body tell me integration between pp with fi,mm,sd.
You want to insert an inspection check point at the end of an operation. How would you do that?
What do we do in the realization phase?
What are all the settings done for configuring the integration of pp with fico?
Describe different types of scrap. Where all different types of scrap can be maintained on SAP user screens?
What is default values at work center
Explain different inspection type you used .
If the scenario is''Party is supplying some material we have to do the some processing operation on it, how it cab be handled in SAP"
What MRP does with Capacity overload