Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?

Answers were Sorted based on User's Feedback



How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?..

Answer / rrbharathreddy94@gmail.com

Plastering with CM = 1:4
Thickness = 25 mm
Area to be plastered = 260.40 square meter
Thickness of moter layer =25mm=0.025M
volume of moter required =260.40X0.025=6.51 Cum
Add 15 percent of allowences for undualation of surface & wastage = 6.51/100X15=0.976Cum
=6.51+0.976= 7.486 Cum ( total Volume of moter required)
Sand required for 7.486 Cum of CM 1:4= 7.486 Cum
Cement required for 7.486 Cum of CM 1:4= 7.486/4=1.871Cum
Wt of Cement Required =1.871X1440=2694.96 Kg = 2695 Kg (say).

Is This Answer Correct ?    0 Yes 0 No

How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?..

Answer / arasu

1sqm 25mm tk 1×1×.025=.025 dry volume of cement =1.33 unit wt of cement 1440kg 1.33×.025×1440×1÷5(1+4)=9.57kg 240sqm×9.57=2298kg÷50=46bag

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How many different between estimated quantity and practical work at site.

1 Answers  


how to do connection between steel beam (I-Section) with R.C.C column??

2 Answers  


what is the difference between weir and a barrage

12 Answers   AAI Airports Authority Of India, CIT, TCI Constructions,


why we put pocket in some structure instead of bolt.

4 Answers   Tisco,


what is the used civil engg?

0 Answers  


why development length = 50D . why not 100D

0 Answers  


How much concrete can be made using one bag of cement?

4 Answers  


What materials were used to build the golden gate bridge?

0 Answers  


for what perpuse we use CBR test in road project?

2 Answers  


what we do if excavation is more than actual requirement

6 Answers   Airtel,


what is Quality Reporting?

6 Answers   NCC,


Minimum and maximum size of the building components

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)