How to find the requirement of cement and sand for the 1cum of rr masonry work
Answer / s k majumder
First one have to choice grade of Concrete. Say M15 grade for which proportion is 1 : 2:4. total 7
N Now dry volume will be of 1 cum concrete is 1*1.52=1.52 cum
Hence
cement= 1.52/7 = 0.217cum = 7.66cft = 6.12 bag say 6 bag
sand (1,52/7)*2 = 0.434 cum= =15.33cft
Aggregate(=1.52/7)*4 =0.868cum= =30.66cft
| Is This Answer Correct ? | 1 Yes | 1 No |
How can we cross check the excavation and backfilling quantities.
How much paint is required for 1sqm.?how to calculate the paint...?
1 Answers MRKR, Sumadhura Infracon,
how many shuttering material required for 1000 sq.m built up area.
what is calculation of cement, snd of 1:4 16mm,12mm plastring
for 100sft of Cement plastering ratio 1:6 How much quantity of cement and sand required.
6 Answers J.K. Organization, L&T,
which is the period is known as golden period in ancient india?
What is the difference between face reinforcement and distribution bar in a concrete structure?
what is the productivity in aluminium shuttering per day
How to calculate the compressive strength of 28 days of concrete where we have 7 days compressive strength?
how much cement consumption in 1 sqmt of wall cleading work (dedo)?
What will be the crank length in an staircase is same like an slab?
how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M 2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)