How to find the requirement of cement and sand for the 1cum of rr masonry work
Answer / s k majumder
First one have to choice grade of Concrete. Say M15 grade for which proportion is 1 : 2:4. total 7
N Now dry volume will be of 1 cum concrete is 1*1.52=1.52 cum
Hence
cement= 1.52/7 = 0.217cum = 7.66cft = 6.12 bag say 6 bag
sand (1,52/7)*2 = 0.434 cum= =15.33cft
Aggregate(=1.52/7)*4 =0.868cum= =30.66cft
| Is This Answer Correct ? | 1 Yes | 1 No |
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
0 Answers Ministry of Agriculture,
what is thumb rule for calculating the size of ISMB required for a particular length of span
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
0 Answers Ras Engineering, UltraTech,
a simple instrument used for the measurement of colour in water is called
What is rate of concrete surface rendering work per sqm
Explain different types of rcc pipes.
Compressive strength of concrete
5 Answers B L Kashyap, Era Infra Engineering,
What is the lap length in your project?
11 Answers L&T, Practical Viva Questions,
M30 me kitan pani lagat hai
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
Spider cracks occur in beam bottom due to––
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
1 Answers JPMorgan Chase, Sobha Developers, Structwel,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)