How much quantity of steel will be used for commercial
building consists of ground floor shops, first floor shops,
second floor will be for offices and third floor will be
office/banks. How many tons of steel is required to
construct this building.
Answers were Sorted based on User's Feedback
Answer / ramesh
.12% to .15% of area of that building measurements to metric tonnes
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / asc
14 tons in general for 4 storeys at 1200 sq ft/floor area
| Is This Answer Correct ? | 0 Yes | 0 No |
Which is the best book for building construction?
what is the meaning fe in steel?
1 Answers Manjeera, Oceanus, PAN, URC Construction,
Brick work how many days curing and at any concreting pl
how many type of pipe using in plumbing?
how to design and calculate materail quantity for concrete speedbreaker ?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
is it correct method to use crush sand in concrete as per is code
For the construction project what capital cost has to be taken in consideration?
what is m30 in concrete tiles
0 Answers Interex, Raj Construction, Spago,
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What is the allowable silt content for concrete works?
what is CBR Test
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)