How much quantity of steel will be used for commercial building consists of ground floor shops, fi..

Answer / ramesh

.12% to .15% of area of that building measurements to metric tonnes

Is This Answer Correct ?    1 Yes 0 No

How much quantity of steel will be used for commercial building consists of ground floor shops, fi..

Answer / rajesh kumar

63Metric tons

Is This Answer Correct ?    2 Yes 2 No

How much quantity of steel will be used for commercial building consists of ground floor shops, fi..

Answer / asc

14 tons in general for 4 storeys at 1200 sq ft/floor area

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3"*4"*9"(Standard size ) an d for 10 cum construction of SSM (Size stone masonary) with Cm 1:6 for both.

11 Answers   GRC, KEC, L&T, Techno Electric and Engineering, UPENN,


1. What type of job are you holding at the moment? Name of present / last employer?

2 Answers   Norbord,


weight of 32mm rod/m

8 Answers  


How to calculate bottom width of landing in a staircase

1 Answers   Tata Steel Limited,


what is the advantage of electronic theodolite over transit theodolite?

3 Answers  






Totally how many Grades of Concrete are there? and Explain Briefly?

2 Answers   Reliance,


Define What is a projection line?

0 Answers  


What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

0 Answers   IVRCL, Techno Art Constructions,


what"s the responsibilities for QC(quality controler)in high rise buildings?

5 Answers   Ashok Leyland,


Explain the difference between shear and tensile strength.

0 Answers  


A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?

5 Answers  


WHICH BOOKS ARE AVAILABLE FOR CIVIL MPSC

2 Answers   BMC, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)