How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?
Answer Posted / arasu
1sqm 25mm tk 1×1×.025=.025 dry volume of cement =1.33 unit wt of cement 1440kg 1.33×.025×1440×1÷5(1+4)=9.57kg 240sqm×9.57=2298kg÷50=46bag
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define Who designed the city of Washington DC?
what is the list of building construction equipment & teir output?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
What out turn civil works
Define What is the origin of name Railway Sleepers?
Draw the cross section of a boundary wall and label its part with detailing?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
how to control PQI (Project Quality Index)
pls mail some more tecnical qustions at msaranya2610@gmail.com
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
what is the permanent solution applied for restoration of leaning tower of pisa?
what are the types of design? which type of method is used at what type of design & why?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.