How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?

Answer Posted / rrbharathreddy94@gmail.com

Plastering with CM = 1:4
Thickness = 25 mm
Area to be plastered = 260.40 square meter
Thickness of moter layer =25mm=0.025M
volume of moter required =260.40X0.025=6.51 Cum
Add 15 percent of allowences for undualation of surface & wastage = 6.51/100X15=0.976Cum
=6.51+0.976= 7.486 Cum ( total Volume of moter required)
Sand required for 7.486 Cum of CM 1:4= 7.486 Cum
Cement required for 7.486 Cum of CM 1:4= 7.486/4=1.871Cum
Wt of Cement Required =1.871X1440=2694.96 Kg = 2695 Kg (say).

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.

1582


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2117


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1209


what is the types of surveying?which type of survey carrying for type of work?

1675


strength vs shape factor

2127






how to calculate the concrete mix m30 by volume

1093


Sir how to find cutting length for footing steel bars in the shape of "u"

1321


How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097

1759


types of laps in column

1913


wat would be the probable interview questions and GD topics for IOCL exam?

9233


For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38

1415


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

1864


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2063


what is difference between GTS bench mark and temporary bench mark

3943


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390