1. if only 1 slab of a floor get sagged, how could be it
repaired?
2. if any footing gives the cube result, after 28 days less
than 16 n/mm2 in spite of 20 n/mm2 what are the remedies ?
Answers were Sorted based on User's Feedback
Answer / venu gopal
2 reasons for saging.1) bad staging/supports. 2) bad
design. any hw if it sagged it does noteffect the next slab
casting we can cast the next one. as far as repairing of
1st slab is consern we should have a graphical
representation of sag and find out the lowest level and
highest level plot them and with the help of this date we
can fix the floor level ilttle elevated than planned and
the sagged area should be concreted (screed concret) with
good mix as per site condition.
2.if it is a big footing we cannot remove and redo. so
remove the top 200mm concret by chiping and use proper
bonding agents and introduce few more rebars through the
coloun and anchor them to the old footing and change the
shape of the footing to a triangular shape with rebars and
re concrete the top surface and additional care to be taken
at the time of casting plinth beam it is better to redesign
the plinth beam to take more load which the coloum will
carry. Note. check the mix design and use skilled manpower
while casting cubes at site. also place them in water
immediately after removing from moulds (delay in this
activity will also cause cube failure)
| Is This Answer Correct ? | 6 Yes | 0 No |
i am completely aggre with venu gopal answer. if possible
the send me your personal e-mail id i want send to you
quary of civil engineering aspect which is arise in my mind.
my e-mail id (rd_shah13156@yahoo.co.in)
| Is This Answer Correct ? | 0 Yes | 1 No |
look if slab get sagged it better to be dismentaling and
construct new slab. by constructing new slab other floors
will not affect, because load carried by column.
your second question if cube result are below their
strength, as per is code it will better to be dismentaling.
| Is This Answer Correct ? | 2 Yes | 7 No |
How do you maintain water pressure?
how to calculate the number of bricks for 10'x10' wall?
what is difference between expansion and construction joint?
WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
how much dry volume of cement in 1cum in m20 grade
what does a civil engineer should know?
why the cube depth is 150 mm which is used for testing
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
purpose of binding wire in RCC. Structually is there any requirements that how to tie the binding wire like cross or single or how many pices combine together to bind the steel. i need structually importance of binding wire.
what is the m25 test result 7 days 14 days
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)