while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
No Answer is Posted For this Question
Be the First to Post Answer
why development length = 50D . why not 100D
What is the diffrence between plinth/basement and plot area
how much lenth of a bar increase when it bends at 90 degree.
In reclamation works what are the importance of geotextiles and sand?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
what is the construction cost for per cft of multistorryed building in kolkata?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
why there is no concrete mix of ratio 1:.5:1
What is the difference between single reinforcement
Define What is diversion tunnel in a dam?
what is the difference between ribbed steel & tor Steel ?