while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
No Answer is Posted For this Question
Be the First to Post Answer
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
which "s the best wood for commercial purpose?
what is work of planning deptt. in any construction compny (in road project)
How to find the requirement of cement and sand for the 1cum of rr masonry work
what is the concrete grade for 1034.13N/mmsq
what is the significance of soundness test in Cement? and how is it done??
1 Answers Biltech Building Elements, Student,
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What is meant by engineering drawing?
how to calculate cement mortor for wet and dry mix for different ratios
What is the cost of Brickwall ( 4")(1:4) thick wall total Area 245 sqft with plaster(1:6). With all materials including.
what is the mean of opc cement and conceret grade 53 n?please explane with detail>
The Geological formation under subanshiri dam is- (1) sedimentary rock (2)metamorphic rock (3) igneous rock (4)none of the above
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)