CM 1:4 !:5..what CM stands for??
and what is standard ratio used for external plaster??
Answer Posted / rohit singh
For external plaster 1:4 have perfect
1-cement
4-sand
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In Rcc ratio calculation I wanted to know quantity of Steel also.
Explain the water bound macadam roag
What is the significance of cost estimate knowledge for an architect?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
what is grade intersection?
use ofr concrete as per grade ?
How to check slab shuttering level.? Or check list for slab ?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
please briefly explain calculating or estimating steel quantity for a RCC column?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
how to convert sand in Cft to Kgs
Why was the empire state building made of steel?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)