Wat are the elements consider in the shuttering load design calculation
Answer / anupam nath
Wet load of concrete (2.6kg/cum) and live load (self as wel
as movement load). if we are using plate vibrator we have
to consider for vibration load (extra supporting
arrangement)
Is This Answer Correct ? | 0 Yes | 3 No |
Specific gravity of Cement? Water?
how to calculate the concrete mix m30 by volume
how to convert ft3 to m3?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
curing of concrete why 7day's,14day's 21day's 28days
What is steel requirement for one cum concrete
What should be the Slump(Min.)in cement in concrete in all grades of concrete?
how much cement sand n bricks required in im3?and how much in plaster?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
what is correct temperature for pouring concrete?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
Why camber is provided?
2 Answers G R InfraProjects, Tata Steel Limited,