how to cement bag calculate m25 grade
Answers were Sorted based on User's Feedback
Answer / madhusudhan
1+1+2=4
1/4=0.25x1440=360kg
Or 7.2bags per m³
For 1m³wet concrete you required 1.54x360kg=554.4kg cement
Or 11.088 bags
| Is This Answer Correct ? | 0 Yes | 0 No |
deshuttering time for RCC for DPC over the foundation.
if water absorption is more than 25 percent in brick, what is the defect in it?
What is scafhold?
2 Answers Cyron Construction, Ramky,
what is the per meter weight of 50 dai steel? explain in detail?
How to calculate cement required for m20,m5 grade
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
What is green building?
what is the minimum cement content for rcc as per is code
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
How will be cutting in timber plate size 600*400 column size
Factor of safety for steel should be based on its yield stress or its ultimate stress and factor of safety for concrete should be based on its ultimate stress or its yield stress?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)