Answer Posted / manikandan
11.5 bag/m3 of concrete
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
what is the meaning of degreasing of the euipment or line.
List out the types of roofs?
"Gates of the dams are generally designed of curved shape". Why?
What is bylayer?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
What is 1/8 on the architect ruler denotes?
How much cement will require for 1Rmt Skirting laying
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
rimmer in pile foundation
how to workable concrete cube test M-25 design mix
How to calculate brick work quantity?? Block work quantity??
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
Mention what are the composition of a landfill?
pls mail some more tecnical qustions at msaranya2610@gmail.com