how we control the temperature during concreting ?

Answers were Sorted based on User's Feedback



how we control the temperature during concreting ?..

Answer / manu

1. by using under ground water in hot whether
2. by steam curing, in cold whether

Is This Answer Correct ?    9 Yes 1 No

how we control the temperature during concreting ?..

Answer / arvindrai

1))By providing temperature bars in concreting section
2)) Providing of Ice pieces at time of mixing

Is This Answer Correct ?    8 Yes 2 No

how we control the temperature during concreting ?..

Answer / sjtbehera

ok we are going to mix admixture for that, but if our
concrete mixer is place near by we can handle this. main
cause of higher temp. is water evapouration. i saw mixing
of ice for that.

Is This Answer Correct ?    2 Yes 0 No

how we control the temperature during concreting ?..

Answer / abinash chandra giri

During concrete in case of
normal weather condition
we must used underground
water/drinking water.if hot
weather condition we must
used ice but we should
follows the is 7861.in cold
season we must used hot
water.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between "working stress method" And "limit state method"?

12 Answers   Atkins, TCE,


what is the use of beam end forces while using a staad ? wha they are show

0 Answers  


what is the anchorage length of reinforcement.

0 Answers   TCE,


hi frnds i hav got thro BHEL written exam..wat to prepare for intervw..guide me plz!!!!!!!!!!!!!

6 Answers   Bhel, HCC,


Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?

1 Answers   IBA,






Explain what is the release of lien?

0 Answers  


what is difference between fluidity and workability also how palsticizer works

1 Answers   BARC, EVA,


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

0 Answers  


What is Rodding in Chimney construction?

1 Answers   SSC,


what is the lap length for pile reinforcement cage in water piling

2 Answers  


RCC MEANS

7 Answers  


how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?

0 Answers   L&T, Puravankara,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)