Dear Sir,
I work in hydro project. I want to hire Scorpio/ Bolero on
monthly basis. But how can i justified its amount (Hourly
basic). Please solve my problem
No Answer is Posted For this Question
Be the First to Post Answer
1:4:8 pcc calculation 591 cu.ft
where do Tie beams used in foundations?
how many binding wire can be required for 1 metric tonne steel?
What is Curtailing of R/F
compare the cost of construction of a building by cement and one in which cement is substituted by fly ash.
what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?
What are the reasons for geotechnical site investigations in uganda?
What is the best design for building bridges?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
is it correct method to use crush sand in concrete as per is code
How to find Weathering Course Material
what is the full form of GGBS?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)