Dear Sir,
I work in hydro project. I want to hire Scorpio/ Bolero on
monthly basis. But how can i justified its amount (Hourly
basic). Please solve my problem
No Answer is Posted For this Question
Be the First to Post Answer
why we do pcc.?
how much cement and sand 1:6 plastering
What is the the difference between piller base and wall base ? give cost difference ?
can we use .5 water-cement ratio for any type of cement?
what is 43 & 53 in cement
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
What is the name of this multiplication factors ?
0 Answers Engineers India Limited, L&T,
difference between trapezoidal and pedestal footing and how the load acts on that
0 Answers Golden Construction,
for what perpuse we use CBR test in road project?