Dear Sir,
I work in hydro project. I want to hire Scorpio/ Bolero on
monthly basis. But how can i justified its amount (Hourly
basic). Please solve my problem
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate cement and sand quantities in cement mortar As 1:1,1:2,1:4,1:6 ?
15 Answers Boss Global, JP Group, Kerakoll, NextGen, Simplex,
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Define What is the distance between railway tracks?
Are cruise ships built for the transatlantic run?
What is the difference in Cement content for M-20 Concrete if y ou use OPC & PPC? What is the difference in the Curing Period?
which "s the best wood for commercial purpose?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
suppose we have a tendency to make a hole on the surface of the beam, than where we goes to make it?
What are the defects in concrete?
i want to make this calution for making a buliding but i dont know the formula for this and also how much cement concrete an sand use for this calculation,calculation is below(100ft lenths 75ftwidth and 100mm thikness)plz brife the calcution thanks
Can a 24" RCC beam can rest on 18" RCC beam.
Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc