Answer Posted / madhusudhan
1+1+2=4
1/4=0.25x1440=360kg
Or 7.2bags per m³
For 1m³wet concrete you required 1.54x360kg=554.4kg cement
Or 11.088 bags
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Will going from a 3-tap to 6-tap increase water pressure?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the difference between engineering stress and true stress?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
2nd and 4rt angle elevation used in which country ?
mean of NH4 pipe
What was asked in isro civil interview
what are the layers of the national and heir aprox thickness??
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
Explain what is Critical Path Method (C.P.M)?
Which is stronger solid steel rod or hollow steel pipe?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
How to decide/consider the grade of bitumen for dbm.
what is the max. area can we apply the plate load test ?