what are the settings needed for variant configuration?
No Answer is Posted For this Question
Be the First to Post Answer
What are the levels of batch, explain batch determination process?
What is 'capacity planning'?
For REM the settings are dependent or normal?
What is MTO & MTS
Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
How do you carry out Capacity leveling?
how many times pcc can run for one material?
How the processing time is calculated in a wc when both labor, machine categories exist?
What is a ‘work center’ in pp?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
How to move to the realization phase?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?