how we can calculate the quantity of sand & cement & also
Aggregate so give me to this answer for a slab
Length is : 25' /3.28 = 7.62 Mtr
Width is : 30' /3.28 = 9.14 Mtr
Depth is : 0.6"/3.28 = 0.15 2Mtr
Answers were Sorted based on User's Feedback
Answer / moiz
3.14 cft of concrete is required.
the quantity of cement sand and aggregates depends on the
proportion we make use of to make the concrete which is not
a big deal...
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / khadar babu
TOTAL VOLUME:
7.62*9.14*.15=10.44cum
(M15 concrete)
cement required= 10.44*6.48=67.7bags=3384.84Kgs
Sand required= 10.44*0.434=4.54cum
Aggregates required= 10.44*0.868=9.06cum
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / bala
Concrete quantity = 112.50 cft
Requried of cement = 19.11 nos bag
Requried of sand = 67.50 cft
Requried of metal = 101.25 cft
Is This Answer Correct ? | 0 Yes | 3 No |
what are different grades of concrete and their classifications?
how we can say that concrete is a plastic concrete
as we take 30% of whole brick work masonry ,so how much % we take in block masonry?
can stub column take the load as main column
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl
how many litres of enamel paint required for 5000 sft of site??
In which grade of steel the laping length required is more,Fe 415 or Fe 500 ? and why?
Which is the direction of negative angle?
How to do base isolation using ETABS software?
is ther any formule for w/c ratio
how much water you will add to the mix, for making 1 m3 of concrete to achieve strength of mix 20N/mm2 at 28 days.
What is special features of RGS Rebar detaling software?